Projects



Boiler 1 &2 Blasting and Painting works

  1. To do the scaffolding & surface preparation by blasting / cleaning. Each dimension as follow 50 MTR height x 2.5 meter dia.
  2. Applications of three coats of high temperature special paints at 120 degree outer surface temperature live Boilers 2 & 3.
u0r4evvuvl|00010371|alamara|Projects|Description